http://www.gojihome.com
Home > Products > Red Goji Berries > Goji Powder

Goji Powder

Product categories of Goji Powder, we are specialized manufacturers from China, Goji Powder, Natural Goji Powder suppliers/factory, wholesale high-quality products of Organic Goji Powder R & D and manufacturing, we have the perfect after-sales service and technical support. Look forward to your cooperation!
China Goji Powder Suppliers

Goji Powder

Gojipowder is a concentrated and cost-effective goji deep processing product. Thereare two kind of goji powder, one is freeze dried goji powder, another is Sparygoji powder

Descriptionof goji powder:

Name: Goji freezedried powder

Type: Freeze Dried fruit powder

Form: Powder

Raw Materials: Fresh Goji Berry Without Pesticide Residue

Drying Method: Freeze Dried

Mesh Size: 60-80 Mesh

Appearance: OrangeYellow Powder

Odor And Taste: Typical Flavor of Goji Berry

Main Functions:Nutritional Supplement, Ehance Immunity

Grade: Food Grade

Application: Food and Beverage Field

Common Use: Use this tasty powder in smoothies, raw fudge or chocolate,fermented sodas, and desserts. Reconstitute into juice at 7:1.

Packing: Drum, 10kg/carton

Place of Origin: Ningxia,China(Mainland)

Storage: Stored in cool and dry places and keepaway from strong sunlight and moisture

Shelf Life: 24 Moths

Nutrition: A source of Vitamin C, iron,beta-carotene and more

Function:

1, Lowing the blood fats, blood sugar, treatinghigh blood fats and diabetes

2,Anti-fatigue, postpone senility, treatingfatiguability, insomnia, Poor appetite, dizziness.

3,Treating oxygen deficit.

4, Regulating organism immunity active.

5, Anti-aging.

6, Strength kidney and liver function.

7, Lower cholesterol.

8, Pharmaceutical stuff.

9, Healthy Food and beverage.


FAQ:

Q: How about payment terms?

A: 30% TT deposit+70% TT before shipment,30% TT deposit+70% TT balance against scanned Copy B/L, Flexible payment can benegotiated.

Q: Production and deliver

A: After deposit, goji berry order enterinto 1st stage( production, packaging, factory inspect, etc), then 2nd stage is CIQ inspection and written CIQ Certificate lead time one week(7 days),3rd stage we arrange

cargo shipment to departure port. Vessel leadtime as per destination port in different countries( Such as North Americaline, South America Line, EMP, Asia,Australia, etc )



Communicate with Supplier?Supplier
Colin Zhang Mr. Colin Zhang
What can I do for you?
Chat Now Contact Supplier